CLSWeb Main
Caltech Library System
Electronic Theses
                  About | Browse | Search | Caltech Student Instructions

Young, Bradley H. (1937-01-01) A two-parameter wind tunnel rigging system. http://resolver.caltech.edu/CaltechETD:etd-03242005-100937


Type of Document Master's Thesis
Author Young, Bradley H.
URN etd-03242005-100937
Persistent URL http://resolver.caltech.edu/CaltechETD:etd-03242005-100937
Title A two-parameter wind tunnel rigging system
Degree Master of Science
Option Aeronautics
Advisory Committee
Advisor Name Title
A.L. Klein Committee Chair
Clark Blanchard Millikan Committee Member
Ernest Edwin Sechler Committee Member
Keywords
  • none
Date of Defense 1937-01-01
Availability unrestricted
Abstract
In January of 1935, definite steps were taken in a two part program to modernize the ten-foot wind tunnel of the Guggenheim Aeronautical Laboratory at the California Institute of Technology. Part one of the program was the design and construction of a new wind tunnel rigging system based on concepts originally laid down by Dr. A. L. Klein, Associate Professor at the same institution. Part two of the program, to be carried on intensively immediately after completion of part one, will be the development of an entirely new force measuring system to replace the present modified steelyard type balances.

In this paper the general problem of wind tunnel testing and equipment will be briefly outlined with the bulk of the discussion then given over to the problems concerning the evolution and design of a specific wind tunnel rigging system. As the system is not yet complete in its final form obviously there can be no description of the project as a finished piece of work. Also, it has been thought inadvisable to present only the system as it exists at present, therefore all the various features or principles that have been considered will be discussed and reason for their discard or adoption made clear. The result should then be a guide or at least an aid to the completion of part one of the modernizing program.

In a latter section of the paper some of the desired features of the contemplated force measuring system will be set down in the hope that they may be a skeletal set of requirements for the second part of the modernizing program.

Files
  Filename       Size       Approximate Download Time (Hours:Minutes:Seconds) 
 
 28.8 Modem   56K Modem   ISDN (64 Kb)   ISDN (128 Kb)   Higher-speed Access 
  Young_bh_1937.pdf 1.78 Mb 00:08:14 00:04:14 00:03:42 00:01:51 00:00:09

Browse All Available ETDs by ( Author | Option )

If you have more questions or technical problems, please Contact the Caltech Library System.